Currently it only shows your basic business info. Start adding relevant business details such as description, images and products or services to gain your customers attention by using Boost 360 android app / iOS App / web portal.
Mr. Akshat Goyal (Riverdale World School)
Educational Infrastructure / Aquatic Tensile Structures
2025-09-19T00:00:00
Low
FV INFRA LLP successfully engineered and installed a state-of-the-art tensile membrane shed for the swimming pool at Riverdale World School, Raipur. Collaborating with Architect Mr. Shailendra Sharma, we designed a structure that allows students to utilize the aquatic facilities year-round, regardless of Raipur's intense summer heat or monsoon rains. The project features high-yield ASTM A500 Grade B structural steel and premium PVDF-coated Type II Architectural Membrane, specifically chosen for its high translucency and 15+ year durability in Central India’s harsh climate.
Representing the school, Mr. Akshat Goyal demanded a solution that met international safety and aesthetic standards. Key requirements included: Maximum UV Protection: Creating a safe environment for students to swim during peak noon hours. Natural Illumination: Ensuring the pool area remained bright and vibrant without harsh glare or heavy artificial lighting. Low Maintenance & High Durability: A "set-and-forget" roofing solution resistant to UV degradation and fungal growth. Strict Deadlines: Completion before the commencement of the summer vacation period.
Our execution at the Kabir Nagar site demonstrated FV INFRA LLP’s commitment to "Engineering with Integrity": Technical Consulting: Provided detailed material analysis on PVDF membranes to assure the client of long-term ROI. Adaptive Engineering: When an unmapped drainage line blocked a primary column location, our team designed a custom cantilevered steel sub-base. This transferred structural loads safely without disturbing underground utilities or compromising design symmetry. High-Performance Fabrication: Utilized a triple-layer epoxy-zinc rich paint system on all steelwork to prevent corrosion from pool chlorine and Raipur’s humidity. DOP Standard Welding: Every joint was DOP (Detailed Operating Procedure) welded to handle high wind-loadings typical of the Chhattisgarh region. Fast-Track Installation: Met a rigorous timeline, delivering a wrinkle-free, perfectly tensioned canopy that has become a landmark for the school campus.
Delivered a 15-year+ lifespan weather-shielded aquatic facility using PVDF Type II membrane, overcoming complex underground utility constraints.
Mr. Akshat Goyal (Riverdale World School)
Educational Infrastructure / Aquatic Tensile Structures
2025-09-19T00:00:00
Low
FV INFRA LLP successfully engineered and installed a state-of-the-art tensile membrane shed for the swimming pool at Riverdale World School, Raipur. Collaborating with Architect Mr. Shailendra Sharma, we designed a structure that allows students to utilize the aquatic facilities year-round, regardless of Raipur's intense summer heat or monsoon rains. The project features high-yield ASTM A500 Grade B structural steel and premium PVDF-coated Type II Architectural Membrane, specifically chosen for its high translucency and 15+ year durability in Central India’s harsh climate.
Representing the school, Mr. Akshat Goyal demanded a solution that met international safety and aesthetic standards. Key requirements included: Maximum UV Protection: Creating a safe environment for students to swim during peak noon hours. Natural Illumination: Ensuring the pool area remained bright and vibrant without harsh glare or heavy artificial lighting. Low Maintenance & High Durability: A "set-and-forget" roofing solution resistant to UV degradation and fungal growth. Strict Deadlines: Completion before the commencement of the summer vacation period.
Our execution at the Kabir Nagar site demonstrated FV INFRA LLP’s commitment to "Engineering with Integrity": Technical Consulting: Provided detailed material analysis on PVDF membranes to assure the client of long-term ROI. Adaptive Engineering: When an unmapped drainage line blocked a primary column location, our team designed a custom cantilevered steel sub-base. This transferred structural loads safely without disturbing underground utilities or compromising design symmetry. High-Performance Fabrication: Utilized a triple-layer epoxy-zinc rich paint system on all steelwork to prevent corrosion from pool chlorine and Raipur’s humidity. DOP Standard Welding: Every joint was DOP (Detailed Operating Procedure) welded to handle high wind-loadings typical of the Chhattisgarh region. Fast-Track Installation: Met a rigorous timeline, delivering a wrinkle-free, perfectly tensioned canopy that has become a landmark for the school campus.
Delivered a 15-year+ lifespan weather-shielded aquatic facility using PVDF Type II membrane, overcoming complex underground utility constraints.